BATTERY STORAGE

BATTERY STORAGE

GATESHEAD

Capacity: 3MW BESS

Fact 2

Fact 3

Fact 4

Overview

We delivered a bespoke off-site substation solution, designed and manufactured to meet the project's specific requirements. Built in full compliance with local regulations and grid requirements, the package was factory tested before our team completed the installation and commissioning on site.

Ashton After 2.JPG

The Challenge

The installation was located within an operational refuse depot, requiring additional protection against the site's harsh environmental conditions. Specialist louvres and filters were specified to safeguard the equipment and extend its operational life.

Our Solution

We delivered a packaged plant solution with a plug-and-play HV and LV arrangement, reducing on-site construction activities and enabling faster installation following delivery.

IMG_2194.JPG

The Approach

Our approach incorporated a split equipment arrangement to provide future redundancy and maintain operational continuity. This allowed the system to continue operating at a reduced capacity during service and maintenance periods.